Want to Know More?

Welcome to the Deeper Dive page. This resource provides a comprehensive, evidence-based overview of the private property right-of-way abandonment request. Explore the archival records, technical studies, and documentation that support this initiative to preserve the character of San Roy Road while ensuring infrastructure stability for the entire community.
Right-of-Way Discovery
Tracing the origin of the right-of-way required going back to historical federal land records. The 33-foot reservation originates from a federal land patent and an original Bureau of Land Management (BLM) survey dating back decades. Unlike a typical locally recorded right-of-way, its history and location required extensive research through these original federal records and was not always recorded locally or linked through a parcel search.

1949 Historical Plat
Initial government survey of property boundaries in this township and range. This historic survey provides important context for how the land was originally mapped and divided. It also helps trace the origins of the property descriptions and reservations that would later affect the San Roy Road corridor.
Why Was It So Difficult to Discover?
Customary due diligence, including standard title work, a boundary survey, and deed review, did not identify the 33-foot right-of-way. Its origin was only discovered by tracing back through decades-old federal land records and original Bureau of Land Management (BLM) documents that were not always available in local archives.
CUSTOMARY DUE DILIGENCE
Nothing Flagged the Right-of-Way
A full boundary survey, thorough title work, and deed reviews were completed as part of the standard acquisition process. None of these customary industry checks identified the existence of the 33-foot historic right-of-way reservation.
Walton County’s abandonment guidance notes that “most deeds are recorded in the public records of the Clerk of Court for Walton County, Florida.”
That was not the case here. This historic right-of-way was not identified through the customary local property-record search and ultimately had to be traced back through historical federal land records.
https://www.mywaltonfl.gov/682/Abandonments
HISTORICAL FEDERAL RECORDS
The Missing Piece
Understanding the reservation's origin required searching beyond modern property records and into decades-old federal land archives. Research uncovered the original federal land patent and BLM records that confirmed the reservation's source, designed for roads and utilities to ensure all parcels had access to new owners.
COUNTY PLANNING STAFF
Acknowledging the Discovery Challenge
Planning staff acknowledged that easements are not always identified through customary searches, stating:
“…if an easement’s not found in our typical search… then sometimes it’s picked up later. Sometimes it’s never picked up.” Staff also noted:
“Sometimes these fly under the radar.”

Today, the 33-foot right-of-way is just part of the front yards of these 7 private properties, not a separate public corridor. It extends through areas containing homes, driveways, landscaping, vegetation, and other improvements, while the actual traveled portion of San Roy Road remains separate and unchanged.
San Roy Road is NOT being affected by this request.
What Does the Corridor Look Like Today?



County Studies & Supporting Staff Reviews
This section summarizes the County's own research, findings, and staff discussions regarding the San Roy Road right-of-way and the sidewalk-easement solution.
COUNTY RIGHT-OF-WAY STUDY
San Roy Road Corridor Study
Walton County hired an outside consultant to evaluate parking needs and right-of-way opportunities throughout South Walton. For the San Roy Road right-of-way, the study identified zero existing parking spaces and recommended zero additional parking spaces.
COUNTY ENGINEER
A Solution Developed with CHANCE POWELL
A meeting with County Engineer Chance Powell helped identify a path forward that could address the County’s concerns while still allowing the abandonment to proceed. The discussion focused on preserving the County’s ability to provide a future pedestrian sidewalk through a dedicated easement, rather than retaining the entire 33-foot right-of-way. This meeting helped shape the sidewalk-easement solution that is now part of the proposal.
These discussions helped shape the proposed solution: preserve the specific public needs identified during the County review, including utilities and the opportunity for a future sidewalk, while allowing the broader historical right-of-way to be abandoned.
PUBLIC WORKS
NO PLANS — AND IMPROVEMENTS DEEMED NOT FEASIBLE
Public Works correspondence spanning several years shows no identified plans for improvements within this area. Public Works specifically cited the limited right-of-way and proximity to Eastern Lake, concluding that it did not believe it was feasible to program improvements in this area. More recent correspondence confirms there are still no current or anticipated County projects within the affected right-of-way.
COUNTY ADMINISTRATOR
A Solution CONFIRMED with BRIAN KELLENBERGER
A meeting with County Administrator Brian Kellenberger further developed the sidewalk-easement concept. During the discussion, he sketched a potential layout for a five-foot sidewalk along the corridor, including the possibility of incorporating stormwater improvements beneath it. The concept demonstrated how a future pedestrian sidewlk facility could be preserved through an easement without retaining the unnecessary 33-foot right-of-way.

Recreation of the sketch Mr. Kellenberger drew on Aug 3, 2026

UTILITIES
Concern
Existing utilities are located within portions of the historic right-of-way, and utility providers need permanent access to operate, maintain, repair, and improve their infrastructure.
Solution
The affected property owners are providing dedicated utility easements so utility access and infrastructure remain protected even after the broader 33-foot right-of-way is abandoned.
Utilities remain protected.

EXISTING HOMES & IMPROVEMENTS
Concern
Homes, driveways, landscaping, and other improvements already exist within portions of this historic right-of-way, creating long-standing inconsistencies for property owners and County staff.
Solution
Abandonment provides an opportunity to clean up these historical inconsistencies and create greater clarity going forward, while dedicated easements continue to protect the specific public uses that remain necessary.
A cleaner long-term solution.
Addressing County Concerns
A More Precise Solution
The proposal does not simply eliminate public protections. It replaces a broad historic 33-foot right-of-way with dedicated easements designed around the public needs identified during the County review process. The road remains unchanged, public access remains unchanged, utilities remain protected, and space for a future sidewalk is preserved.
The County review process helped identify the public interests that needed to be protected before the right-of-way could be abandoned. Rather than simply asking the County to eliminate the right-of-way, the property owners worked with County staff and utility providers to develop solutions that preserve those important public needs.

FUTURE SIDEWALK
Concern
County staff wanted to preserve the ability to provide a future pedestrian sidewalk facility along San Roy Road.
Solution
The property owners agreed to provide a dedicated pedestrian easement that preserves space for a potential future County sidewalk without requiring the County to retain the entire 33-foot right-of-way.
A future sidewalk remains possible.

PRESERVATION OF THE EASTERN LAKE CORRIDOR
Concern
The broad 33-foot right-of-way preserves the possibility of additional future public infrastructure within an environmentally sensitive corridor adjacent to Eastern Lake, a protected coastal dune lake.
Solution
The proposal replaces the broad right-of-way with more targeted easements for the public uses that have actually been identified, utilities and a potential future sidewalk. This helps preserve the existing character of San Roy Road and provides greater protection for the Eastern Lake corridor from unnecessary future infrastructure expansion.
Protect what is needed. Preserve what makes this area special.
Timeline & Schedule
April 16, 2026
Project Application Submitted
Formal request for right-of-way abandonment initiated with Walton County, including submission of required application materials.
July 2026
Staff Reporting & Review
Through continued review and meetings with County staff and utility providers, the proposal evolved to address the County’s concerns while preserving important public interests.
August 13, 2026
Public Hearing & Recommendation
The Planning Commission held a public hearing on the abandonment request and voted unanimously to recommend approval to the Board of County Commissioners, to abandon this right-of-way.
June 3, 2026
Technical Review Committee (TRC)
Comprehensive review by County departments identified key concerns involving safety, access, utilities, and public interests. The TRC process helped us better understand those challenges and work with County staff to develop solutions that address them.
May - August 2026
Utility Coordination Meetings
Ongoing coordination with utility providers to confirm that existing and future utility needs would be protected under the proposed solution.
September 8, 2026
Board of County Commissioners Meeting
The Walton County Board of County Commissioners voted 4-1 to REJECT this abandonment. We are working on options for next steps to fight this.
<< WE ARE HERE AND NEED YOUR EMAIL SUPPORT
The Solution
Preserve the public uses that matter without retaining the entire 33-foot right-of-way.
TODAY
- A broad 33-foot historic right-of-way extends into 7 privately owned properties.
- Homes, driveways and other improvements already exist within portions of the right-of-way.
- Existing utilities rely on portions of the right-of-way.
- The County retains broad future use of the entire 33-foot corridor, creating the potential for future infrastructure that could conflict with efforts to preserve the environmentally sensitive Eastern Lake coastal dune lake corridor.
IF APPROVED
- The unused 33-foot right-of-way within the 7 properties is formally abandoned.
- A dedicated easement preserves space for a future sidewalk.
- Permanent utility easements protect existing and future utility access.
- Existing property and development inconsistencies created by the historic ROW are reduced.
- San Roy Road and public access remain unchanged.
- The Eastern Lake corridor receives greater protection from unnecessary future infrastructure expansion.
WHY PRESERVATION MATTERS
Over the years, very different visions have been proposed for the future of Eastern Lake. Looking back at those proposals provides an important reminder of why long-term preservation matters.
A VERY DIFFERENT VISION FOR EASTERN LAKE
Proposed Canal Project — 1978
In 1978, officials were studying a proposal for a major canal connecting Peachtree Creek, Eastern Lake and the Gulf. The proposal envisioned a three-mile canal and was promoted, in part, as a way to open the area to additional construction and development. The project was ultimately never built. It is a remarkable reminder of how ideas and priorities can change over time, and why decisions affecting environmentally sensitive places like Eastern Lake deserve careful consideration.
Plans change. Priorities change. But once an area like Eastern Lake is permanently altered, we may never get it back. That is why we believe preservation should be part of every decision about its future.
SPECIAL THANKS
This has been a community effort.
We would like to sincerely thank everyone who has taken the time to meet with us, answer questions, share information, raise concerns, and help us work toward solutions throughout this process.
What began as a complicated right-of-way issue has required a lot of research, conversations, meetings, and cooperation. Each step helped us better understand the challenges and ultimately develop a proposal that protects important public needs while helping preserve San Roy Road and Eastern Lake.
COUNTY STAFF & LEADERSHIP
Chance Powell, Walton County Engineer
For taking the time to meet with us, discuss the right-of-way, and help us better understand the County's engineering concerns and considerations.
Brian Kellenberger, Walton County Administration
For meeting with us, discussing possible solutions, and helping explore the concept of preserving space for a future sidewalk through a dedicated pedestrian easement.
Stephen Schoen, Walton County Planning Director
For taking the time to meet with us, discuss the application, listen to our questions and concerns, and help us better understand the County's planning process and the issues that needed to be addressed.
Brad Bohn, Walton County Environmental
For his time reviewing the application, discussing environmental considerations, and helping us better understand the issues involving Eastern Lake and the surrounding area.
Scott Rosenheim, Walton County Surveyor
For his time and assistance researching and explaining the historical right-of-way and the records surrounding it.
Ayanna Reed, Walton County Planning
For helping guide the application through the County review process and answering questions along the way.
Walton County Public Works Staff
For providing historical information, correspondence, and insight regarding San Roy Road and the surrounding right-of-way.
Mac Carpenter, Former Walton County Planning Director
For taking the time to share his knowledge and experience with us, helping us better understand the County planning process and providing valuable perspective as we worked through this unique right-of-way issue.
Josh Erwin, Beach Operations
For taking the time to meet and discuss the application and pedestrian considerations, and provide valuable insight regarding the potential for a future sidewalk along San Roy Road.
COUNTY REVIEW BOARDS
Members of the Technical Review Committee
Thank you to the members of the TRC for their questions, concerns, and careful review of the application. The TRC process helped identify issues that needed to be addressed and ultimately helped us work toward solutions.
Members of the Walton County Planning Commission
Thank you for taking the time to hear the application, ask questions, consider the information presented, and unanimously recommend approval to the Board of County Commissioners.
UTILITIES & PROFESSIONAL ASSISTANCE
Regional Utilities, Chelco & Okaloosa Gas Representatives
Thank you for working with the affected property owners to identify the easements necessary to preserve access to existing utilities and protect future utility needs.
Surveyors, Attorneys & Title Professionals
A special thank you to Will Dunaway of Clark Partington for his assistance in drafting the easements necessary to preserve Regional Utilities’ access, and to the other professionals who helped us work through decades of property records, surveys, federal documents, title information, ownership questions, and easement requirements. Their work helped us better understand how this historic right-of-way came to exist and what would be required to address it properly.
OUR NEIGHBORS & COMMUNITY
A very special thank you to the San Roy Road and Eastern Lake property owners, neighbors, residents, and community members who have shared information, offered encouragement, written letters, attended meetings, and supported our efforts.
And especially to the seven affected property owners who have worked together throughout this process and agreed to provide the easements necessary to create a solution that protects important public needs while resolving the broader historic right-of-way.


